|
|
|
![]() |
|
|
|
#1 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Hi Folks, for those intrested it traction , I will post here with ongoing developments re my new traction L/O.
here is the link to the start of the new acquired room. http://www.the-gauge.com/thread14576...long-last.html Putting track into street and cobble stones http://www.the-gauge.com/thread12361...-trackage.html Building traction poles here. http://www.the-gauge.com/thread15290...-overhead.html Scratch building a interurban here. http://www.the-gauge.com/thread7224-...-and-that.html Chapter 2 will follow soon
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#2 (permalink) |
|
Senior Member
Join Date: Dec 2004
Location: Chicopee, MA
Posts: 813
|
Hey thanks for putting all of your previous how-to's together.
I've always wanted to model some inter-urban overhead. I always balked because of the meager supply of cheap, yet exquisitly detailed streetcars. Now you gave me some ideas. KEEP IT UP! |
|
|
|
|
|
#3 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Glad it helps zedob,
It gives folks a referance in the same thread as I build my thing
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#4 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Here is Chapter 2.
Most of the track is in on the right of the bench work. Main Station has to be finished yet before we continue onto the other side. ![]()
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#5 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
I will finish all track work before the over head is worked on, as we have to think of the easy way of bringing it all together.
Chapter 3 to follow. ![]()
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#6 (permalink) |
|
Pooh Bah
Join Date: Mar 2002
Location: Brampton, Ontario, Canada
Posts: 4,951
|
Chris: you need to take care where you cross the big railway -- with poles they installed a metal net trough over the wire to catch a dewirement and get the trolley car out of the way. Don't know about pantographs -- maybe double or triple wire?
Saw a photo last weekend of the Dearborn Street Railway (Mich.) crossing a steam railway. Double track reduced to single, spring switches on each side, and the overhead was two wires across -- no frogs. Couldn't make out any trolley pole catchers.
__________________
David NMRA #010887; NARA #79 Perth & Exeter Railway Company Esquesing & Chinguacousy Radial Railway |
|
|
|
|
|
#7 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Thanks David I will read up on that.
![]()
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#8 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Had a few hours to compleat the two main lines and plant a few poles.
So here we go First three pictures show the over head being put in on a back streach. This was going to be in a tunnel, but I am going to make a culvat at the back for the run this allows me to have a lower town maybe 2 " higher than the base for the town development, instead of 4 ".
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#9 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Fist shot is now going to house the Interurban barn, in the high town.
the other shots are of the main station. Inside tracks are overhead outside for steam/ diesel operation. That`s it for now. ![]()
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#10 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Did a bit of work this week and put the track in where my interurban dead end station will go.
These are the easy switch throws I make so I don`t put my big hand under the wire to throw them. I am not to fond of electric throws when I can reach the switch.
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#12 (permalink) | |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Quote:
Hi Jack, They are cedar strips from an old wood kit I had knocking around. The keep the throw wire in the grove I cut out with the dremal tool. Also they give it a finnished look.. Drill pilot holes first and use rail spikes and there you go ![]()
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
|
#13 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
Hi Folks, I managed to get some more Plans into actual bench progress, that thing called work gets in the way.
Still putting the skeleton together, and I HAVE almost finished the whole track plan , overhead is another job to do. Just a few pics of the work todate.
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#14 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
I hope to have the traction poles and overhead up in this hick town section before it`s screwed into place.
Still a lot of work to do before the tracks are operational. That`s when I can get in there with the scenery stuff.
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
|
|
#15 (permalink) |
|
Senior Member
Join Date: Aug 2002
Location: Pickering. Ontario. Canada.
Posts: 4,498
|
It has been a while since I posted here, that`s cause its been a while since I got anything done.
I have started on the overhead in the freight yard, and hope to get that done, I am in between three two day shows with the traction in action L/O, two still to go. Hoping to get at it again soon. ![]()
__________________
Chris. Traction Nut. Keeping the sparks flying off the overhead Building a Traction Layout. http://www.the-gauge.com/showthread.php?t=15354 http://www.2guyz.info/index.php |
|
|
|
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Tiny traction Layout | 60103 | Track Planning | 11 | 09-27-2006 04:26 PM |
| Taking time to visit an old friends Traction Layout | interurban | Traction Thoroughfare | 8 | 09-26-2006 09:18 AM |
| This is the last year for my current Traction Layout | interurban | Traction Thoroughfare | 18 | 11-15-2004 05:51 PM |
| Building My First Layout | Chessie6459 | Track Planning | 9 | 08-21-2003 11:50 PM |
| Building my first layout!!! | Chessie6459 | HO Scale Model Trains | 2 | 08-04-2003 09:36 PM |