HobbiesHobby ForumHobby WikiHobby Blogs
Zealot Hobby Forum

Go Back   Zealot Hobby Forum > The Gauge - Model Trains > Model Railroading > N / Z Scale Model Trains



Reply
 
Thread Tools Display Modes
Old 04-15-2008, 07:30 PM   #1 (permalink)
blue303
Junior Member
 
Join Date: Apr 2008
Posts: 10
Default New Layout

Hello, everybody. For my first post I decided to show off my new layout that I am building. It is based off of the HO scale Rock Ridge Central that Model Railroader had in the January 2002 issue. It now fits on a 3' x 5' board. The main theme I am going for is a freelanced western railroad serving a copper mine in the early 1960's. The minimum track radius is 11". I am not sure what grade I need to use yet to clear the tracks under the mine branch track. Probably 3 or 4% grade. I plan on having the layout transportable.

I drew it up in XTrkCad. Then I printed it out full size. It is nice having access to a large format printer. I used sign foam for the base and framework. It makes for a light and fairly rigid structure. On the negative side it is rather expensive. I lucked out that at work they were throwing away a display made out of it. I ended up with enough for two 3' x 5' layouts. After getting the base together I added one sheet of 1 1/2" insulation foam.

That is a picture with the layout drawing on it. I tacked that down so I could make where the tracks go. A toothpick worked well for marking the foam. After that I went back and used a sharpie to highlight all of the track marks.

This picture shows some of the cork that glued down today. I would have got more done but I misplaced the rest of my thumbtacks.

I plan on making updates as a progress on this. My goal is to have the terrain fully roughed by sometime July.

Edited to change 3' x 6' to 3' x 5'.

Last edited by blue303; 04-16-2008 at 06:37 AM.
blue303 is offline   Reply With Quote
Old 04-15-2008, 07:36 PM   #2 (permalink)
Ralph
Remember...it's for fun!
The Gauge Moderator
 
Ralph's Avatar
 
Join Date: Jun 2002
Location: St. Paul, MN
Posts: 6,453
Default

Hi and welcome! I remember that plan. Looks good! Keep us up to date on your progress!
Ralph
__________________
Now interchanging with the freelanced KINGS PORT & WESTERN
Ralph is online now   Reply With Quote
Old 04-15-2008, 09:25 PM   #3 (permalink)
TruckLover
BNSF and UP all the way!!
 
TruckLover's Avatar
 
Join Date: Apr 2006
Location: Rancho Santa Margarita, Cali.
Posts: 3,534
Default

Welcome to the Gauge!!

Looking good, keep the pics coming
__________________
Josh M.

Trucklover's Layout Index Thread

TruckLover is offline   Reply With Quote
Old 04-15-2008, 11:06 PM   #4 (permalink)
Herc Driver
Senior Member
 
Herc Driver's Avatar
 
Join Date: Apr 2005
Location: North Carolina
Posts: 1,499
Default

WOW that's great having a 1:1 drawing to set things up on. What a great planning tool. Good looking layout too.
__________________
Flying the Herc to pay for the trains!
Herc Driver is offline   Reply With Quote
Old 04-20-2008, 08:00 PM   #5 (permalink)
blue303
Junior Member
 
Join Date: Apr 2008
Posts: 10
Default

Update. I have been busy since I started this thread. I got all of the roadbed and rail done on the lower level. The incline set went on nicely. The water area is cut out. It still needs alot of work there. The most important thing is that I have an operation train now. So far the electrical consists of jumper wires. My next project is going to be getting some real wiring on the lower level.




edited to add missing word.

Last edited by blue303; 04-26-2008 at 11:13 AM.
blue303 is offline   Reply With Quote
Old 04-20-2008, 11:11 PM   #6 (permalink)
Nomad
Senior Member
 
Nomad's Avatar
 
Join Date: Sep 2006
Location: Elks Plain, Washington
Posts: 1,477
Default

Ain't it great when you see that first train run?
Congratulations

Loren
__________________
You can't help getting older, but you don't have to get old.
George Burns
Nomad is offline   Reply With Quote
Old 04-21-2008, 06:22 PM   #7 (permalink)
jesso
Senior Member
 
jesso's Avatar
 
Join Date: Jul 2006
Location: Washington, Utah
Posts: 515
Default

It's looking good! Keep it up! Can't wait to see how your river turns out!
__________________
Scott

My Layouts: New Desktop Layout, Inglenook, Baseball Module, Desktop Layout, HO Layout.
jesso is offline   Reply With Quote
Old 04-21-2008, 08:00 PM   #8 (permalink)
blue303
Junior Member
 
Join Date: Apr 2008
Posts: 10
Default

Thanks for the comments. Getting the first train to run on this layout was a great feeling. Now if I can teach my little catzilla to quit attacking the caboose I will be in better shape.

I am curious to how the water is going to turn out too. I'm not quite sure if I want it to look like a water inlet or a mostly dry riverbed. I think either one would look right. The mostly dry riverbed seems a like it would fit the theme I'm going for better.
blue303 is offline   Reply With Quote
Old 04-21-2008, 08:55 PM   #9 (permalink)
steamhead
Senior Member
 
steamhead's Avatar
 
Join Date: Apr 2005
Location: Brownsville, TX
Posts: 1,968
Default

Ooohhh yeaahhhh...!!!! That first train run is something to remember...When that came about in my new layout...there was much whoopin' and hollerin' going on..!!!
Good luck..and may it bring you many happy hours...!!!
__________________
Gus (LC&P).
steamhead is offline   Reply With Quote
Old 04-25-2008, 06:50 PM   #10 (permalink)
Mountain Man
Senior Member
 
Mountain Man's Avatar
 
Join Date: Jan 2007
Posts: 669
Default

IT'S ALIVE!
Well...see..he gave it the juice...and...it...moved...
__________________
Quis custodiet ipsos custodes?
Who is watching the watchers?
Mountain Man is offline   Reply With Quote
Old 04-26-2008, 11:12 AM   #11 (permalink)
blue303
Junior Member
 
Join Date: Apr 2008
Posts: 10
Default

I have been making some good progress this week. I got all of the roadbed down and 97% of the track. I even have started three of the four mountains.

Sorry about the blurrynes in this one. It does show Catzilla though. That is important for later.

Now the roadbed is down and drying.

The rail is down now.

That is from last night. Two out of four mountains started. I have my main bus wire. I just need to get some feeder wire so I can get started on the wiring.

We have some more mountains and daylight.

Bridge and mine scene.

Around the bend.

The otherside of the bend. See all those thumbtacks and wet glue. That is the repair I have to do since the Catzilla attack. She decided to jump up on the layout. The books that was holding down the mountain fell and took out the track. I guess you could say we had an avalanche this morning. Nobody was hurt.

The goal for the rest of the weekend is to get the mountains roughed out.

edited. I notice the kink in the track in the last picture. I just fixed it. Just noticed it when I looking over this post.

Last edited by blue303; 04-26-2008 at 11:16 AM.
blue303 is offline   Reply With Quote
Old 04-26-2008, 11:45 AM   #12 (permalink)
jesso
Senior Member
 
jesso's Avatar
 
Join Date: Jul 2006
Location: Washington, Utah
Posts: 515
Default

Looks great. Sorry to hear about the Catzilla attack. I have heard that happens even on 20 foot high layouts so I guess I am lucky to have no cats. What are you using to cut your foam?
__________________
Scott

My Layouts: New Desktop Layout, Inglenook, Baseball Module, Desktop Layout, HO Layout.
jesso is offline   Reply With Quote
Old 04-26-2008, 12:06 PM   #13 (permalink)
Ralph
Remember...it's for fun!
The Gauge Moderator
 
Ralph's Avatar
 
Join Date: Jun 2002
Location: St. Paul, MN
Posts: 6,453
Default

Good looking progress! Catzilla made me laugh because one of mine "walked the line' from time to time when she was younger and spry enough to leap up there.
Ralph
__________________
Now interchanging with the freelanced KINGS PORT & WESTERN
Ralph is online now   Reply With Quote
Old 04-26-2008, 12:21 PM   #14 (permalink)
blue303
Junior Member
 
Join Date: Apr 2008
Posts: 10
Default

I have been using a scratch built hot wire foam cutter. I made it for work for displays and such. It is based off of a design I found on the web. It uses a radio shack transformer, light dimmer & guitar string. It works really well. The beauty of using pvc pipe on it that I can make it bigger or smaller.
blue303 is offline   Reply With Quote
Old 04-26-2008, 12:30 PM   #15 (permalink)
TrainNut
Ditat Deus
The Gauge Moderator
 
TrainNut's Avatar
 
Join Date: Sep 2004
Location: AZ
Posts: 2,020
Default

Wow, you put those insta mountains in and that critter took on a whole new personality. I would advise devising a means of keeping catzilla out of this room as he/she will be a never ending source of destruction and frusturation.
__________________
TrainNut's layout index page
TrainNut is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off

Similar Threads
Thread Thread Starter Forum Replies Last Post
Name that Layout COMBAT General Talk 163 04-21-2008 09:13 AM
suggestions on a layout-within-a-layout Santa Fe Jack HO Scale Model Trains 3 07-22-2006 11:19 AM
Small N scale layout or table layout Pmagall Track Planning 14 01-29-2003 01:10 PM
Suggestions for my layout 1st layout? Derrick W Garrett Track Planning 9 12-17-2002 02:53 PM
Scaling from and HO layout to an N layout woowoo N / Z Scale Model Trains 4 01-01-2002 08:03 PM


All times are GMT -4. The time now is 05:49 PM.



Search Engine Friendly URLs by vBSEO 3.0.0 ©2007, Crawlability, Inc.